Add: North Area of New & Hi-tech Park, Pingxiang City, Jiangxi Prov, China.
Tel:
+86 13387997914,
+86 799 3671932
Fax: +86 799-3671922
Postcode: 337000
Website: www.siton-china.com
The mucking loader is mainly used in coal mines, metal mines, hydropower tunnels and other underground projects. The company has developed different kinds of loaders many times and updated them to adapt to different working conditions including section from 2.0 x 2.0 m to 9 x 9 m (Height x Width), slope within 33°.
1. The mucking loader adopts Electrohydraulic control system with reduced-voltage start Suitable for long tunnel projects.
2. Main movements controlled by pilot valves, Easily operated and stable.
3. 30% of the configurations are imported. Oil will be Multistep filtered. With air cooling radiator.
4. Load rocks completely without labor work.
5. Convey rocks with chain -scraper, stable and high efficiency.
6. Semi-enclosed assembling,easy to maintain.
Model | Unit | LW- 80/30.75G | |
Weight | Kg | 6800 | |
Loading ability | m³ | 80 | |
Digging width | mm | 4800 | |
Digging distance (from Dozer Blade) | mm | 1840 | |
Digging height | mm | 2400 | |
Digging depth | mm | 550 | |
Dumping height | mm | 1250 (Variable) | |
dumping distance | mm | 2050 (Variable) | |
Traveling speed | m/min | 0.37/ 0.75 | |
Scraper chain Speed | m/min | 26 | |
Scraper chain | Single chain single motor | ||
Min.turning radius | m | ≥12 | |
Max.work pressure | Mpa | ≤20 | |
Clearance from track | mm | ≥27 | |
Whole power | KW | 30.75 | |
Distance between bearings | mm | 1111 | |
Track gauge | mm | 600/ 762/ 900 | |
Max.material size (Depth* Height) | mm | 480×610 | |
Max.boom angle | (°) | ±55 | |
Dimensions during transport | Length | mm | 6800 |
Width | mm | 1480 | |
Height | mm | 1780 | |
Dimensions during operating | Length | mm | 8260 |
Width | mm | 1940 | |
Height | mm | 1855 | |
Adaptive tunnel dimension (Width× Height) | m | ≥2.2× 2.2 |
FAQ:
1. Will necessary spare parts be offered in time?
Normally we suggest customers to buy spare parts for at least 2 years of operation once they buy a new equipment. We will also deliver enough spare parts to our distributor in some countries.
2. How to solve the unusual faults during operation?
SITON will give prompt reply on how to repair the equipments within 24 hours once we receive the fault report. We can also send engineers to the site if necessary.
3. Does SITON offer training for operating and maintenance?
Customers can send their engineers to SITON for one week training and necessary accommodation will be offered free of charge. We will send engineers to the site for technical support if customers requires.